Let's say a task runs from 3/1/2009 - 3/12/2009. Can I resize this, dragging the left side from 3/1/2009 to 2/20/2009. The new task bar would change visually to show 2/20/2009 - 3/12/2009.
I have not downloaded the evaluation yet, just wanted to see if this would suit my needs first.
Tim