Hi,
I would like to have some suggestions. I have searched the forum and the KB and I understand now that there's a difficulty mixing long labels with the pie3d. I might be able eventually to truncate these long labels, but before proposing that to the organization I work for, I would like to see if anyone have any suggestion on how to approach/manage long labels and the pie3d.
(I'm thinking about showing them under the pie while hovering my mouse over the pieces of the chart, but seeing only one at a time. Is that possible?)
Thanks in advance,
Oli700
PS : The pie3d is actually w=460 h=150