Hi, two simple questions... I wont to set the value on a Single Column 3D to display at the top of each column? also is it posible to set the top of the graph to be 20pixels above the top of the tallest column without displaying a y axis? Any ideas? Thanks
-
Perfect all problems sorts. Thanks so much.
-
Hi thanks for the suggestions. I have attached a screenshot so you can see the position of the number values and also open to suggestions on getting more space above the columns. bgColor='FFFFCC' baseFont='verdana' baseFontSize='10' baseFontColor='000066' hovercapbg='FFFFCC' hovercapborder='000066' showYAxisValues='0' numdivlines='5' divLineColor='CCCCCC' divLineAlpha='80' decimalPrecision='0' showAlternateHGridColor='1' AlternateHGridAlpha='30' AlternateHGridColor='CCCCCC' rotateNames='1' slantLabels='1' showValue='1' formatNumber='0' formatNumberScale='0'
-
Hi all, I am trying to get a canvas gradient to run from top to bottom not left to right. I am using canvasBgColor="D9D5F1,FFFFFF" Can i add another command to make the gradient top to bottom. Thanks
-
Hi all, is it posible to change the legend dot to a line? Thanks
-
Hi all, seen this error a lot on the forum but seen no actual reasons why this is happening so here goes... I can display a chart in IE with no problems but other browser like Firefox, Opera and Safari I get "Error in loading data" Someone must have a fix for this??? Thanks
-
Hi all, I am have a lot of trouble displaying a logo on my Gantt chart and hoped that someone can help? The code i am using is as below... <chart logoURL="logo.swf" logoPosition="TL" logoAlpha="100" showTaskNames="1" dateFormat="dd/mm/yyyy" hoverCapBgColor="FFFFFF" hoverCapBorderColor="333333" ganttLineColor="99CC00" ganttLineAlpha="20" baseFontColor="333333" gridBorderColor="99CC00" taskBarRoundRadius="4" showShadow="0"> Any ideas why nothing displays? Thanks
-
Hi all, I am getting to grips with the Gantt which I think is fantastic however I have another issue. When I use the process and tasks together I noticed that the process bar is on top of the task. Is it posible to change the order so I have the tasks on top of the processes like it is with the milestones? Thanks again for all the help.
-
Very nice. All sorted. thanks again.
-
Hi, I am having trouble using the toolText and the link on the Gantt Chart. As i cant seem to get either working. Are these available for the free versions? Thanks all
-
Hi all, I am well aware that with the main Fusion Graphs you can use popups, but can this be don with a Gantt as I cant get it too work? I would use link="P-detailsWin,top=0........... Any ideas??? Thanks
-