jayjaybee Report post Posted September 25, 2007 When creating, say, 3 pie elements in a multi level pie chart, is there any control as to where the first element is rendered. (i.e. like on 0 degree?). Is the start positioning of each element governed by any rule? Many thanks J Share this post Link to post Share on other sites
Pallav Report post Posted September 27, 2007 It starts at 0 degree. Share this post Link to post Share on other sites