I'm loading a gantt chart with a large number of processes/tasks and it appears that at some vertical point the drawing of the background grid lines and connectors stops, even though the chart continues to be drawn i.e. the datatable continues to extend and the bars continue to be shown but no connectors or grid lines.
Is there some limit to the vertical height of a gantt that prevents the lines on the chart being drawn?
If so, is there a way round this?
Thanks,
David