msherwoo Report post Posted December 5, 2007 I see power charts has a dashed="1" option that can be assigned as part of the <set> tag, but is it possible with FusionCharts 3.0? thanks, Mike Share this post Link to post Share on other sites
FusionCharts Support Report post Posted December 6, 2007 Hi, please use Dashed='1' in SET element to show dashed line Share this post Link to post Share on other sites
msherwoo Report post Posted December 6, 2007 Thanks. I will certainly try it. But perhaps you can clarify something. Since the "dashed" property is set on a single datapoint, how does FusionCharts know if it should draw a dashed line up to that datapoint or from that point on? I can see how a it makes sense on a column chart, where the individual column is shown with a dashed outline, but with a line chart it seems that the system would need two datapoints specified before it knows where the draw the dashed line. Or maybe it's a flag, that says "I am going to draw a dashed line until told differently"? I realize trying it will answer this, but I want to understand the design behind it. thanks, Mike Share this post Link to post Share on other sites
FusionCharts Support Report post Posted December 7, 2007 hi, The first value which is set to dashed will draw a line from that point (anchor) until the next value is reached..i.e. next anchor..showing the next value. Hence the the last value with a dashed='1' option is useless. Thats the trick. Share this post Link to post Share on other sites