Sign in to follow this  
Pallav

Power chart elements Z-order and HGrids

Recommended Posts

I was playing around with the DargNode example in order to evaluate its suitability to our needs.

I encountered some issues:

1) How can I determine the z-order of the charts elements except of relying on their order in the xml?

This is problemtic when I need to located a sub-chart, including connectors on top of  a large shape the will function as a background to the sub-chart

2) How can I add horizontal swimlanes to the chart? and how can I determine the y start point and swimlane height?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this